Seach This Blog
Tag Cloud
AOI Baking BGA CAF Carrier Component drop/detachment Concept Contamination Cpk DFx ECM (Electrochemical migration) ENIG FATP Fishbone Flux FVT Gold HASL HIP(Head-In-Pillow) ICT IMC LCM LTS Manufacturing glossary MFI newbie NWO(Non-Wet-Open) OSP Panel & De-panel PIH Popcorn-Effect Problem analysis & solving Reliability Short circuit Solder broken crack Soldering Solder paste Stencil Temperature Profile Troubleshooting V-cut Video/Youtube Warpage Wave-soldering X-raySponsor
Categories
- Case study
- Connector
- Corrugated Paper
- Design
- EDX/EDS/SEM/IMC/FTIR
- Fundamental Science
- Glue/adhesive/epoxy/underfill,
- Keypad
- Management
- Manufacture
- Moisture Sensitive
- PCB/FPC/PTF
- Personal Opinion
- Plastic
- Process
- Product Introduction
- Quality
- Reliability
- Role & Responsibility
- SMT
- Soldering
- SPC
- Test/Inspection
- Uncategorized
Bookmarks
Histats
Statcounter
Email Subscription
Author Archives: WorkingBear
Jun19
Increase solder paste volume will improve the MLCC capacitor broken?
Recently WorkingBear got complaint from R&D and ask increase the solder paste volume on the MLCC (Multi-Layer Ceramic Capacitor) component pads to improve the capacitor broken issue. R&D said he had verified that the capacitor’s footprint in the board design … Continue reading
Jan05
Comparison between shielding-can directly mount and shielding-clip/frame
Recently one of my top manager ask to mount the shielding-can or call shielding-cover directly on the Printed Circuit Board to instead of mount the shielding-clip or call shielding-frame on the board first then cover the shieling-can. He said this … Continue reading
May03
Trouble Shooting Guide for Plastic Injection
Trouble Suggested Remedies (Solutions) DIMENSIONAL PROBLEMS Shot-to-shot dimensional variations Increase injection pressure Maintain uniform pad (cushion) Repair leaking back flow value if pad cannot be maintained Increase screw forward time Maintain uniform cycle Eliminate un-melted particles (see below) Use larger … Continue reading
Apr07
Solution to Prevent Component Drops During Second Time Reflow Soldering
Due to the rapid growth of mobile phone technology, the Electronic Manufacturing Service (EMS) in mainland China sometimes faces serious labor shortages. Additionally, Industry 4.0 promotes the need for factory automation in EMS. As a result, certain parts that cannot … Continue reading
Mar09
What Process Impact of Substituting SMDs with Paste-In-Hole components?
One day, my manager asked me a question: “Will changing the components from SMDs (Surface Mount Devices) to THDs (Through Hole Devices) and using the PIH (Paste-In-Hole) process affect the process and design?” I later realized that the question aimed … Continue reading